All Projects
SalemFive Bank - Salem, MA Offices
One of Berkeley's latest ventures was an ambitious 10,000 square foot renovation project on the 5th floor of Salem Five's headquarters, located in the heart of downtown Salem, MA. This extensive makeover transformed the space into a functional and modern office environment. The project encompassed the construction of new offices, cubicles, a breakroom with a kitchen area, and bathroom upgrades. Undertaken during Salem’s bustling Halloween season, this project presented unique challenges that were handled with exceptional precision and management skills. We successfully navigated the complexities of working in a live, dynamic environment, ensuring minimal disruption while maintaining our commitment to quality and efficiency.
MIT - Sloan School of Management Student Spaces
This recently completed project at MIT’s Sloan School of Management has transformed an existing basement-level locker room and furniture storage area into a modern study room suite. By repurposing these underutilized areas, the renovation has provided MIT’s students with a more conducive space for studying and collaboration.
The Friendly Toast - Tuscan Village - Salem, NH
This project consists of an interior fit-up of another Friendly Toast restaurant that is coming to Tuscan Village. This location will also include a spacious outdoor dining area equipped with a custom steel fabricated pergola, awnings, and string lights.
The Friendly Toast - Nashua, NH
Currently underway in Nashua, NH, this exciting transformation will turn a former Fidelity Investments office into a new Friendly Toast restaurant! Set to be one of the largest in its fleet, this renovation will not only breathe new life into an existing space, but will also expand the Friendly Toast's beloved presence, offering its unique, eclectic menu to Nashua's culinary scene.
Boston University - Questrom Multipurpose Room
This project consisted of a renovation of an existing multi-function room on the 4th floor of a 10-story building that can be divided into 3 spaces with new operable partitions. Buildout included new finishes, light fixtures, and a state-of-the-art A/V system that controls all functions in the space, including lights and window shades!
Northeastern University - Speare Hall
The Spear Hall project was a renovation of the East and West wing lounge and study spaces. The project consisted of 8 lounges utilized by students at the university. Each lounge was updated with all new finishes including carpet, ACT ceiling, paint, light fixtures, and acoustic paneling. The acoustic paneling plays a significant role in the student’s privacy by eliminating noise and allowing students to use the lounges to study.
Northeastern University - Snell Engineering - Staff Office
The MIE Staff Suite Office project was a renovation of 1,200 sf of office space and 1,020 sf of multiuse classroom and conference room spaces. The rooms were complete with new carpet, paint, custom millwork, ACT ceiling, light fixtures, and updated fire protection.
Northeastern University - Cabot Center Bathrooms
The Cabot Center Restrooms project was a renovation of the second-floor men’s and women’s restrooms. This work included regrouting of existing block wall, all new floor tile, bathroom partitions, bathroom accessories, light fixtures, and a re-configuration of the existing HVAC system.
Harvard University - Kennedy School - Littauer Building
The Harvard Kennedy Littauer Seminar Rooms 330 and 332 project was a renovation including new carpet, paint, ACT ceilings, storefront glass, and an upgrade to the existing fire protection system. A unique feature of this project was a new under carpet power system, and new audiovisual equipment installed into both seminar rooms to be utilized for classes and lectures.
Cold Regions Research and Engineering Laboratory (CRREL) - New 24 Ton Chiller
The 24-ton Chiller project requires extensive coordination and testing to ensure the equipment is up and running properly. The team has tested the equipment’s ammonia detection, supervisory alarm, and chiller settings, all of which are running as designed. An important element of the chiller is connecting the air intake cooling coil to a mixing valve. The team was required to raise the temperature of the cold glycol from -37 degrees to 50 degrees shifting between cold and hot glycol systems. Once the 24-ton chiller is up and running, it requires a few days to dial in the chiller settings and ensure everything is ready for use.
Groton School - Health Center
Groton School Health Center renovation of about 2,500 sf. Work included new floor configuration to add 2 additional health rooms, new finishes: drywall, ceilings, flooring, paint, plumbing for a new sink at nurse station, new HVAC and electrical systems and upgrades to fire protection and fire alarm system. Work included new door and door operator for bathroom on the first floor and kitchen modifications to add a cooktop and associated hood.
Boston University - Sabelhaus Laboratory
Berkeley Building Company has teamed up with Boston University on a 1,850SF renovation of one of their existing lab spaces. The renovated space will serve as Boston Universities latest 3-D Printing Lab Space that will accommodate the research needs of incoming faculty Dr. Drew Sabelhaus. The project is well underway with a target completion date of September 1st, 2023.
Somerville Music Spaces
Somerville Music Studio was an interior fit-up of multiple music spaces, including three practice rooms, two studio rooms, a large rehearsal room, and a performance auditorium. Careful execution of the acoustic design was required to prohibit any sound leakage to the abutting businesses and residential condos. A key note in this project was the coordination required to handle the pre-tensioned concrete slabs in the space as well as maintain the sound design!
Harvard University - Smith Center - HUPAD
Harvard HUPAD project is an open office concept. The scope of the work involves demolition of select MEP components and walls; furnish and install new walls, ceilings, MEP/FA components, finishes, and millwork. The tenants will have plenty of space and a nice view of Harvard Square Yard.
Boston College - McMullen Museum
In September of 2022, BBC submitted a proposal to perform some work for Boston College at the McMullen Museum of Art. The converted mansion on Commonwealth Avenue also serves as a teaching museum and conference center. BC Alum Peter Lynch (Fidelity Vice-Chairman) has made a large gift to the museum, including a Picasso from his personal art collection, that will be on display. The project included adding wall space, relocating electrical devices, audio-visual equipment, and HVAC T-Stats. The work also included revised lighting controls, partial light fixture replacement, installing a conduit raceway system for a new security system as well as miscellaneous lobby improvements. The work started in January as is nearing completion.
SalemFive Bank - Beverly, MA
SalemFive was the interior fit-up of a new SalemFive branch in Beverly. This project was unique in that a 5-panel sliding glass door was installed and designed to fold behind a custom millwork panel door. Close coordination with the city as well as the base building was acquired to achieve TCO as the base building did not yet have permanent power! Another highlight was achieving completing this project five weeks ahead of the projected schedule
Buckingham Browne & Nichols School - 197 Coolidge Street
Existing residential home was converted into office space for the school’s administration department. Work included replacement of existing hvac and ventilation systems, new LED lighting, new fire alarm and emergency lighting systems, restroom upgrades, and ADA accessibility changes along with new painting and carpeting throughout the building.
90 Antwerp Street
90 Antwerp is a newly completed multi-family project that includes 20 units, 12 of which are affordable. The project is a mix of 1,2 and 3 bedroom units, with amenity spaces, storage areas and covered parking. The exteriors of the buildings are multi colored sidings that match much of the adjoining neighborhood construction with the grounds landscaped with native plantings and a dedicated park area for use by both building residents and neighbors.
Boston MA
44 Burbank Condominiums
Partners: SMMA
Ground-up 9 story luxury condominium building a block from Symphony Hall in Boston's Back Bay
Boston, MA
Genuity Science
Partners: SMMA
Fit-out of a high-end office space on Canal Street in Boston. Work involved steel and wood structural reframing, new MEP systems, and high-end finishes.
Boston, MA